You need an architect in Mallorca as soon as your work needs a project: when it touches the structure, changes the volume or use of the building, or is a full renovation. Spanish building law then requires an architect to write the project and direct the works on a residential building, and an aparejador to direct the construction. Hiring one runs in eight steps: check which procedure applies, meet and visit the property, agree scope and fee in writing, have the project drawn, get the licence from the town hall, tender the work, build, and hand over with the certificate of completion. Simple work such as new floors only needs a notice to the town hall, and the law does not require an architect for it.
When you legally need an architect in Mallorca
The rule comes from Spain's building act, the Ley de Ordenación de la Edificación (LOE). If the work needs a project, an architect must write that project for a residential building and direct the works. Work needs a project when it touches the structure, changes the volume or the use of the building, or amounts to a full renovation. A new build or an extension falls under it as well.
Simple work is different. New floors, painting, or a kitchen or bathroom that keeps its layout are notified to the town hall with a comunicación previa, the procedure that replaced the old obra menor. The law does not require an architect for it. Some of these works, for example on non-load-bearing walls, still need a technician's signature. Whether a wall carries load decides which procedure you are in, so have it checked before design starts. The procedures are set out in building permits in Mallorca. What we take on as an architect in Mallorca is on our service page.
If the building itself stays untouched, the question is a different one: architect or interior designer. We answer it in interior designer or architect.
Who else is involved besides the architect
The aparejador. On works with a project, an arquitecto técnico, usually called the aparejador, directs the construction on site. Architect and aparejador together form the dirección facultativa. Some practices and many building firms bring an aparejador with them. Ask who appoints this person and whether the cost is in the proposal.
The architects' association and its visado. The execution project and, at the end, the certificate of completion must be stamped by the Balearic architects' association. That stamp is the visado. It confirms that the author is qualified and that the documents are formally complete. It is not a technical review of the design.
The town hall. The Ayuntamiento receives the notice or grants the licence. On works with a licence it charges a construction tax and a licence fee. Each municipality sets its own rates and has its own procedures. Depending on the plot, further bodies have a say: in a protected natural area, the nature protection authority issues a report before the licence.
The owners' association and the building firm. In an apartment building, the owners' association has to be informed and has to agree once the structure, the facade or shared parts of the building are affected. The building firm is a separate contract. You can sign with a general contractor that brings its own architect, or appoint the architect yourself and have them tender the work. The difference is explained in general contractor or architect-led renovation in Mallorca.
The steps from first contact to handover
Before the first sketch, the architect establishes what exists and what is allowed: which parts of the house are on the register, what the plot permits and which procedure applies. With a finca on rustic land this check belongs before the purchase, because unlicensed extensions cannot always be legalised.
After the first meeting and a visit to the property you receive a proposal. Spain has no official fee scale, so the fee is agreed with the practice, and two proposals can only be compared on scope. How architects charge is covered in how much an architect in Mallorca costs.
For a licence the architect prepares two documents, the basic project (proyecto básico) and the execution project (proyecto de ejecución). In Palma the town hall has to decide within three months, counted from the day the documents are complete. If it asks for more, the clock stops, and in practice it often takes longer. Work starts once the licence is granted, and the town hall must be told at least ten days before the start.
For the construction, the architect writes a specification and collects quotes against it, so that every firm prices the same work. During the build, the architect and the aparejador direct the works. At the end the site direction issues the certificate of completion. In Palma, larger works such as a full renovation or an extension then need a first occupation licence. How these stages add up in time is described in how long a renovation in Mallorca takes.
What to ask an architect before you sign
- Is the architect who signs the project registered with the Balearic architects' association, and will you meet that person?
- Which phases does the proposal cover: feasibility, design, basic project, execution project, tender, site supervision?
- Are the aparejador and the visado included, and are the town hall's tax and fee listed as a separate item in the cost estimate?
- Who appointed the architect and the aparejador: you or the building firm?
- Who writes the specification, and who checks the builders' quotes?
- How often is someone on site, and in which language do you receive reports?
- How are changes after sign-off charged, and do they need your written approval first?
- Which procedure does your municipality require, and how long is it likely to take there?
- Which finished projects on the island can the practice show you?
How to prepare the conversation itself is in the first meeting with your architect. If the work is mainly about the interior, use the ten questions for an interior designer in Mallorca.
Working with an architect when you live abroad
From abroad, what matters most is who is in charge on the island. One party should hold the drawings and the specification, and every firm on site should report to that party and not to you. Decisions then reach you grouped on set dates, each with a recommendation.
Ask for reports with photos taken from the same viewpoints on every visit, and for a photo of every wall before it is closed. Quotes, site notes and letters from the authorities arrive in Spanish or Catalan, so agree on a summary in your language before you approve anything. Two or three trips are usually enough: when the layout is built, to approve samples in the house, and for handover. The details are in renovating in Mallorca from abroad.
How CARLO Design works as your architect in Mallorca
CARLO Design was founded in 2015 by architect Charlotte Wiessner. Our Mallorca studio is in Palma, at Carrer de Can Sales 14. We first check what can be permitted and which procedure applies. We prepare the project for the licence together with an architect registered with the Colegio, with whom we have worked for years, and we stay your contact throughout. We are not a building firm: we write the specification and compare the quotes, and you sign directly with the firm that builds.
During construction we are on site every week, check the work against the drawings and send you reports with photos, in English, German or Spanish.
FAQ
Do I need an architect for a renovation in Mallorca?
Yes, as soon as the work needs a project, which is the case when it touches the structure, changes the volume or use of the building, or is a full renovation. For residential buildings, Spanish building law (the LOE) then requires an architect for the project and the direction of the works. Simple work such as new floors or a bathroom that keeps its layout is only notified to the town hall with a comunicación previa, and no architect is required for it.
What is the difference between an architect and an aparejador?
The architect writes the project and directs the works. The arquitecto técnico, usually called the aparejador, directs the construction on site. On works with a project the building act requires both, and together they form the dirección facultativa. Ask who appoints the aparejador and whether that cost is in the proposal.
What is the visado of the architects' association?
The visado is the stamp of the Balearic architects' association. The execution project and, at the end, the certificate of completion have to carry it. With it the association checks that the author is qualified and that the documents are formally complete. It is not a technical review of the design.
Can an architect from my home country handle a project in Mallorca?
A practice at home can contribute the design. For a residential building, though, the project for the building licence is written by an architect registered with the Colegio, and during construction someone has to be on site regularly and speak Spanish with the builders. Agree who covers these two jobs on the island before you appoint anyone for the design.
How long does it take from hiring an architect to the start of works?
That depends on the procedure and on the municipality. If the work needs a building licence, Palma has to decide within three months, counted from the day the documents are complete. If the town hall asks for more documents the clock stops, and in practice it often takes longer. The design phase comes before that, and its length depends on the scope.
Your project in Mallorca
Tell us what you are planning and where the house or apartment is. In the Project Check we clarify whether you need a project and a licence, and how the steps run in your municipality.
You can work out roughly what a renovation costs in two minutes. Open the cost and timeline calculator.